Integrated steel facilities present complex operational hazards including molten metal handling, blast furnace gas (CO) exposure, overhead crane lifting, and multi-level contractor activities.

The Challenge Prior to deployment, the facility relied on paper permit books and physical log sheets across 4 operating units, resulting in: - Unchecked SIMOPS conflicts during shutdown maintenance. - Inconsistent energy isolation verification (LOTO try-out tests). - Delayed CAPA closure for field hazard observations.

The Solution & Deployment The plant digitised its permit-to-work workflow using the **beSafe EHS Platform**: - Installed QR codes at all 180 substation breakers and isolation valves for mobile LOTO validation. - Enforced mandatory digital double-signoff (Issuer + Senior EHS Officer) prior to hot work authorization. - Automated SIMOPS conflict checks preventing simultaneous permits in adjacent gas-hazard zones.

Quantifiable Results - **412 Consecutive Days Zero LTI** achieved across 3,500 employees and contractors. - **-92% Reduction** in permit approval waiting time. - **100% Audit Readiness** during statutory Factory Inspectorate reviews.